Ulchin 4
Ulchin, Kyongbuk, Korea
Pressurized Water Reactor (PWR)
Net Output: 950 MWe
Under construction. Initial criticality: 09/1998. Commercial start: 06/1999.
- Utility:
- Korea Electric Power Corp.
- Reactor Supplier:
- Combustion Engineering. Inc.
- Korea Heavy Industries and Construction Co.
- Steam Generator Supplier:
- General Electric Co.
- Korea Heavy Industries and Construction Co.
- Architecture:
- Korea Power Engineering Co., Ltd.
- Sargent & Lundy Engineers
- Construction:
- Dong Ah
- Korea Heavy Industries and Construction Co.
Unit Specific Plant Parameters
Plant Address and Contacts